Work Accident Analysis Using Hirarc Method (Hazard Identification, Risk Assessment And Risk Control) In Maintenance Division CV. Prosperous Utama Dira
##plugins.themes.bootstrap3.article.main##
Abstract
Human resources are an important asset in a company and need to be developed. Human resource development is related to the performance generated in achieving the company's targets. The sustainability of human resource performance cannot be separated from work accidents. Many factors often cause work accidents such as: human error, electric shock, etc. This study aims to identify potential hazards, calculate risk level values, analyze the results of risk assessment calculations, and propose controls and solutions to reduce potential hazards and work accidents. The research was conducted in the maintenance division of CV. Dira Utama Sejahtera. It’s a manufacturing company engaged in the field of line pipe. The research was conducted using the Hazard Identification, Risk Assessment, and Risk Control (HIRARC) method. The results showed that there were 9 potential hazards, namely collision on the feet or head, electric shock, falling from the pipeline, pinched between pipelines, chemical explosion, hands hit by hot pipes, splashed by material, hands hit by drill bits, and slipped until the leg is sprained. The results of the risk level assessment that 11,1% fall into the category of low risk and extreme, 33,3% moderate risk, and 44,4% high risk. For risk control, it is proposed by elimination, administrative control, engineering control, and the use of Personal Protective Equipment (PPE).
##plugins.themes.bootstrap3.article.details##
[2.] Dwisetiono, & Fairussihan, JD (2022). Risk Analysis of Occupational Health and Safety (K3) in the Ship Repair Process at PT. Dock and Shipping Surabaya Using the HIRARC (Hazard Identification, Risk Assessment, And Risk Control) Method. HEXAGON: Journal of Engineering And Science, 3(1), 10–16.
[3.] Fathimahhayati, LD, Wardana, MR, & Gumilar, NAG (2019). OHS Risk Analysis Using the HIRARC Method in the Tofu and Tempe Industry in Selili Village, Samarinda. RECAVATION Journal, 7(1), 62–70.
[4.] Giananta, P., Hutabarat, J., & Soemanto. (2020). Analysis of Potential Hazards and Improvement of Occupational Safety and Health Systems Using the HIRARC Method at PT. Boma Bhishma Indra. Valtech Journal (Journal of Industrial Engineering Students), 3(2), 106–110.
[5.] Gunawan, AA, & Bendatu, LY (2015). Improvement of Occupational Health and Safety Using the HIRARC Method at PT. Source Rubberindo Jaya. Titra Journal, 3(2), 421–426.http://publication.petra.ac.id/index.php/teknik-industri/article/view/3528/3198
[6.] Ihsan, T., Edwin, T., & Octavianus Irawan, R. (2016). K3 Risk Analysis Using Hirarc Method In Production Area PT Cahaya Murni Andalas Permai. Andalas Journal of Public Health, 10(2), 179–185. https://doi.org/10.24893/jkma.v10i2.204
[7.] Karundeng, I., Doda, DV, & Tucunan, AA. (2018). Hazard and Risk Analysis Using the Hirarc Method in the Production Department of PT.Samudera Mulia Abadi Mining Contractor Likupang, North Minahsa. Journal of Public Health, 7(4), 1–7.
[8.] Mayadilanuari, AM (2020). Use of HIRARC in Hazard Identification and Risk Assessment in Loading and Unloading Works. Higeia Journal of Public Health Research and Development, 4(2), 504–512. https://journal.unnes.ac.id/sju/index.php/higeia/article/view/30908/15901
[9.] Saputro, T., & Lombardo, D. (2021). Hazard Identification, Risk Assessment And Determining Control (HIRADC) Method in Controlling Risk at PT. Mighty Eagle Zae.JournalBoltsAndManufacturing , 3(1),23–29.https://uia.e- journal.id/bautdanmanufaktur/article/download/1316/761/
[10.] Standard Australian License. (2004). AS/NZS 4360:2004 Risk management in Security Risk Analysis, Brisbane: ISMCPI.
[11.] Soekiswara, TEF (2020). Accident And Safety Factors In The Use Of Cranes In Construction Projects. Tower Journal, 18(2), 42–50.
[12.] Srisantyorini, T., & Safitriana, R. (2020). Implementation of Occupational Health and Safety Management System on the Construction of the Jakarta-Cikampek 2 Elevated Toll Road. Journal of Medicine and Health, 16(2), 151–163. https://doi.org/10.37598/tameh.v10i1.127
[13.] Susan, E. (2019). Human Resource Management. Journal of Educational Management, 9(2), 952–962.
[14.] Trisaid, SN (2020). Work Accident Risk Analysis in Rig Service Activities Using Hirarc Method With FTA Approach. Scientific Journal of Industrial Engineering, 8(1), 25–33. https://doi.org/10.24912/jitiuntar.v8i1.6343
[15.] Triswandana, IWGE (2020). OHS Risk Assessment with the HIRARC Method. UKaRsT: Kadiri University Civil Engineering Research, 4(1), 97–108. https://doi.org/10.30737/ukarst.v4i1.788