PULVERIZER MAINTENANCE PLANNING ON STEAM POWER PLANT USING RELIABILITY CENTERED MAINTENANCE (RCM) METHOD
##plugins.themes.bootstrap3.article.main##
Abstract
Competition between companies today requires companies to continue to improve by improving the industrial system. Machine reliability is one of the programs to increase the competitiveness of a company in meeting consumer demand. The pulverizer machine is a very important supporting machine for producing electricity. The pulverizer has several components that are often damaged, such as the coal feeder, gearbox, hydraulic pump, and grinding roller, which causes the production process to experience downtime. This research is about planning the maintenance of machine components. This problem will be solved by using the FMEA approach with Reliability Centered Maintenance (RCM) to determine the failure mode and the effect of failure on critical components. There is 1 failure mode that has the highest Risk Priority Number value. The failure mode is a torn V-Belt. The results of the MTTR and MTTF calculations are used to determine the time interval for the torn V-Belt failure mode, the MTTF value is 735.32 hours or 30.6 days, MTTR is 44.84 hours or
1.8 days. Recommendations for appropriate action through the Task Selection V-Belt failure mode fall into category A, namely Safety Problem with Time Directed (TD) action and optimal scheduling planning of 15 days.
##plugins.themes.bootstrap3.article.details##
[2.] Harnadi Bangun, Irawan, Arif Rahman, And Zefry Darmawan. 2014. Production Machine Maintenance Planning Using Reliability Centered Maintenance (Rcm) II on Om Blowing Machine (Case Study: Pt Industri Sandang Nusantara Unit Patal Lawang) Production Machine Maintenance Planning With Reliability Centered Maintenance (Rcm) II In Blowing Om Machine (A Case Study In Pt Industri Sandang Nusantara Unit Patal Lawang).
[3.] Ma, Fakhrudin, And Said Salim Dahda. 2021. “Determination of Lathe Component Replacement Interval Using the Age Replacment Method.” Journal of Technology 08: 70–82.
[4.] Ratna Bhakti PS, And Sudiyono Kromodihardjo. 2015. “Designing a Maintenance System Using the Reliability Centered Maintenance (Rcm) Method on the Pulverizer (Case Study: Paiton Unit 3).” Its Journal of Engineering 6, No. 1(2337–3539).
[5.] Rendy Firman Maulana. 2021a. “Long Heating Facility Maintenance Planning With Reliability Centered Maintenance Method Approach (Case Study: Plant 2 Unit 2 Pt. Indospring Tbk Gresik).”
[6.] ———. 2021b. “Long Heating Facility Maintenance Planning With Reliability Centered Maintenance Method Approach (Case Study: Plant 2 Unit 2 Pt. Indospring Tbk Gresik).”
[7.] Rizky, Aulia, Asman Nr, And Endang Pudji. 2021. 02 Juminten : Journal of Industrial Management and Technology Analysis of Corrective and Preventive Machine Maintenance Policy with the Rcm Method in Cv Xyz.
[8.] Sariyusda. 2018. “Reliability AnalysisCentered Maintenance (Rcm) Rail Conveyor On Btu Pyramax 150n Oven Machine At Pt. Flextronics Technology Indonesia-Batam.” Jmemme (Journal Of Mechanical Engineering 2(1): 33–42.Http://Ojs.Uma.Ac.Id/Index.Php/Jmemme.
[9.] Sinaga, Zulkani, And Mochamad Ardan. 2021. 6 Journal of Mechanical Engineering Planning for Welding Mig Machine Maintenance on Sub Frame Production at Pt. Xyz By MethodReliabilityCenteredMaintenance(Rcm) .Http://Journal.Uta45jakarta.Ac.Id/Index.Php/Jktm/Index.
[10.] Treatment Systems, Analysis Et Al. 2021. Analysis of the Lathe Machine Maintenance System Using the Rcm (Reliability Centered Maintenance) Method at Cv. Jaya Perkasa Teknik